Services offered

We are happy to offer you all our services. Experience has shown that the following services may be of particular interest to you.

Explosion protection

In the energy industry, the handling of natural gas and, increasingly, hydrogen makes it essential to consider explosion protection. We are happy to offer you the following services:

Water protection

The use of water-polluting substances in auxiliary systems for power generation means that the requirements of system-related water protection must be observed. We are happy to offer you the following services:

Creation
As part of a site inspection, we assess the local conditions and determine the potentially explosive areas. Based on this, we develop the explosion protection concept which, as the core of the explosion protection document, contains the operating concept, the primary, secondary and tertiary protective measures, the zone classification and a final assessment of explosion safety, taking into account TRGS 725. In addition, the necessary organizational measures and inspection intervals in accordance with BetrSichV are determined and recorded in the explosion protection document. If required, we can carry out an assessment of ventilation measures in accordance with DIN EN 60079-10-1.
Additional support
We are also happy to support you in drawing up the checklist for explosion-protected equipment in accordance with Directive 2014/34/EU (ATEX) and creating a zone plan.
Necessity
The explosion protection document must be created before commissioning, as it forms the basis for the pre-commissioning inspection in accordance with Section 15 BetrSichV and the instruction of your employees.
Contents
The main contents of the training are Awareness of explosion protection, chemical-physical principles of explosions, regulations, operating concept, primary, secondary and tertiary protective measures, risk assessment, explosion protection document and zoning, equipment according to ATEX Directive, tests according to BetrSichV, organizational measures
Active participation
Content can be better internalized through active participation. In our training courses, what you learn is applied directly to your company. For example, the training can be combined with a joint site inspection.
Final examination
We can conduct a final examination on request. Independently of this, a certificate of attendance is issued for each participant, which you can use to prove that you have attended the training course.
Inventory analysis
To this end, we first carry out an inventory analysis of the existing documentation. As part of a site inspection, we work with you to identify potentially explosive areas.
Implementation
We draw up an explosion protection document for you in accordance with Section 6 (9) GefStoffV. Based on this, we train you and your employees. We support you in the training of qualified persons in accordance with Annex 2 Section 3 No. 3.1 BetrSichV for the tests in accordance with Annex 2 Section 3 No. 5.2 BetrSichV. For the tests in accordance with Annex 2 Section 3 No. 5.2 BetrSichV, we work together with the trained qualified persons in accordance with No. 3.1 to draw up a test plan (incl. checklist of explosion-protected equipment in accordance with Directive 2014/34/EU (ATEX) and test report). We are also happy to carry out pre-commissioning inspections or periodic inspections of your systems in accordance with Annex 2 Section 3 No. 5.1 BetrSichV.
Long-term cooperation
Building on this, we can also carry out training courses and periodic inspections in accordance with Annex 2 Section 3 No. 5.1 BetrSichV (every 6 years) in subsequent years. We are of course also available for the explosion protection processing of new systems.
Exemption from the requirement to determine suitability
As the operator, you have the option of making use of the exemption from the requirement to determine suitability (Section 41 AwSV) and having the suitability of your system determined by an AwSV expert by submitting the required evidence of the system components together with a water protection expert opinion.
Content of the expert opinion
Taking into account the evidence in accordance with § 41 (2) sentence 1 (e.g. general design approvals), it is demonstrated that the installation as a whole meets the water protection requirements.
Authority's deadline
The installation may be constructed and operated as planned if the competent authority has neither prohibited the construction or operation nor specified requirements for the construction or operation within a period of six weeks after submission of the relevant evidence and the water protection expert opinion.
Content of the expert opinion
The content of the expert opinion can include all water protection-related content for which the authority requires the opinion of an AwSV expert.
Obligation to inspect according to location
Annex 5 of the AwSV specifies the inspection dates for systems outside protected areas or provisionally secured flood areas. Annex 6 lists the inspection dates for installations within the aforementioned areas.
Inspection dates and intervals
AwSV installations must be inspected before commissioning, after significant modification, periodically and when decommissioned
Obligation to inspect
The obligation to inspect is specified for the various types of system in Annex 5 and Annex 6 of the AwSV. We would be happy to check the obligation to inspect your systems for you.

Our contact options

Do you have questions about our services or need a quote? Feel free to contact us by phone, e-mail or via our contact form.